亚洲精品三级_亚珊孕妇αV在线播放_日本A片视频网站_日韩AⅤ成人有码

亚洲精品三级_亚珊孕妇αV在线播放_日本A片视频网站_日韩AⅤ成人有码

亚洲精品三级_亚珊孕妇αV在线播放_日本A片视频网站_日韩AⅤ成人有码_av免费播放网站_在线不卡_不卡操逼AV

    <label id="ebawq"></label>
    <s id="ebawq"></s>

  1. <center id="ebawq"><table id="ebawq"><font id="ebawq"></font></table></center>
  2. <tr id="ebawq"></tr>

    1. <tr id="ebawq"><var id="ebawq"><mark id="ebawq"></mark></var></tr>
      <dfn id="ebawq"></dfn>
      <tfoot id="ebawq"><var id="ebawq"></var></tfoot>
      搜索

      QQ:

      605445556

      EMAIL:

      raruijian@163.com

      TEL:

      +86-13705871665

      圖片模塊
      圖片模塊
      圖片模塊
      圖片模塊
      Plastic drainage belt 2019 field construction work
      2019-06-01 14:41:03?? admin?? ? 535 535

      A, the plastic drainage plate construction work
      1, according to the design requirements, the use of the theodolite, ruler. Release drain plate with hard plastic belt (30 cm wide and 1 cm long), in sand layer about 20 cm, with ShiBan a tag. According to the equilateral triangle arrangement, plate spacing of 1.0 m, error must not exceed 5 cm. Clear line sequence number and hole.
      2 and a set of plastic drainage plate using play to bushing, sleeve bottom set tube boots, its material can choose steel plate, steel or hard plastic, such as pattern according to experience.
      3, driving machine to correct mobile positioning, install drain wear boots bolt. Driving machine operating as a member of the socket should be good control of the positioning, landing its error control within plus or minus 50 mm.
      4, in the process of playing a shall, from time to time, pay attention to control the perpendicularity of the casing, the vertical deviation shall not be greater than + / - 1.5%.
      5, top tube to the top of the sand cushion layer above 50 cm, cutting drain control on the top of the sand cushion layer above the exposed length of not less than 30 cm.



      6, when the drain back to the belt length is more than 50 cm, must be next to the hole fill plug, until after passing to move the hole; And bring back the root of the number can take more than 5% of the total number of root; The length of the plastic drainage plate into sand cushion should not be less than 500 mm.
      7, into the foundation should be for the whole board, plastic drainage plate length is insufficient to be prepared in accordance with the following methods and requirements: when the need to take long plastic drainage plate, should be to drain a membrane peeling, insert core body to lap, lap length not less than 200 mm), and the membrane filter after good, wrapping package, with fine wire rope or perforation and firm, also can use the same connection strength of large staple nail; Each "extension board" only one joint, dispersing, extension board adjacent drain without joint; Pick up usbam using total does not exceed 10% of the total number of play set root.
      Unit 8, recorder, detailing each root into the depth, inclination of plastic drainage plate, back and fill plug, etc., after being inserted hole hits, is strictly prohibited to do memory record.
      9, every drainage plate after inserted to meet the design requirements, switching to the construction of the band drain.
      10, timely clean up after plugged up silt, and sand backfill material after plugged drain holes around.
      11, each section after completion of construction, plastic drainage plate should be self-checking, after waiting for self-inspection of qualified, again by supervision engineer acceptance, inspection unqualified shall promptly carry out repair, inspection, after inspection qualified can move to the next section.
      Before 12, construction level and comparison of the original design of the elevation and increase the length were determined. Need to be extended for a record of construction must be done.
      13, a section after the acceptance of plastic drainage plate immediately with sand cushion layer sand material carefully when fill the driven around the plate to form a hole and buried plastic drainage plate in the sand mat layer; Filling in thicker or stones difficult location, should use vibration driving machine construction, or with a guide hole machine after opening first board.
      Second, the matters needing attention of construction
      1, strict protection of plastic drainage plate materials in good condition, hold the following should be mat wood planks, damp cloth, top with a plastic cover is good, in case of weathered.
      2, twisted, fault is strictly prohibited, tear drainage sheet of membranes.
      3, it is forbidden to sporadic short extension use of plastic drainage plate, (except the whole roll of plastic drainage plate have).
      4, plastic drainage plate on interruptions and drawing process, must be firmly plugged into light, prevent vibration and impact the pile deviation and the vertical deviation.

      Copyright: Ruian Ruijian Infrastructure Engineering Co., Ltd. Copyright ©2019 浙ICP備19023892號

      http://www.zjruijian.com  TEL:86-0577-66080718 

      亚洲精品三级_亚珊孕妇αV在线播放_日本A片视频网站_日韩AⅤ成人有码

        <label id="ebawq"></label>
        <s id="ebawq"></s>

      1. <center id="ebawq"><table id="ebawq"><font id="ebawq"></font></table></center>
      2. <tr id="ebawq"></tr>

        1. <tr id="ebawq"><var id="ebawq"><mark id="ebawq"></mark></var></tr>
          <dfn id="ebawq"></dfn>
          <tfoot id="ebawq"><var id="ebawq"></var></tfoot>
          日韩一极片| 黄色AA无码A片网站| 丁香五月螥| 99精品毛片| 欧美性爱首页大导航| 五月天av电影| AV天堂一区二区三区| 国产精品自拍极品一区| 亚洲AV无码久久资源| 久久无码精品免费av| 国模无码视频| 亚洲Sm网| 亚洲AV综合网| 亚洲色情不卡| 欧美a级片视频| 95AV在线播放| 日韩无码AV搞一下| 无码AV中文| 亚洲无码12| 夜夜噜日日噜成人精品| 无码性做爰片免费毛片| 港澳A片| 香蕉一区二区| 色情www日本欧美| 欧日韩一级| 日本美女黄色片 Aa| 韩国高清无码久久AV| 涩99久在线观看| A片视频福利| av在线一| 日韩操AV| 中国少妇A片| 韩日免费看电影| 换妻黄色片| 久草视频6| 黄色一级AVwww| 潮吹日韩| 手机A片在线| 欧美91在线视频| 制服美女 AV 在线| 岛国高清无码|